{"id":26869,"date":"2025-09-08T14:11:33","date_gmt":"2025-09-08T14:11:33","guid":{"rendered":"https:\/\/stadtwolmirstedt.de\/major-construction-project\/"},"modified":"2025-09-08T14:11:42","modified_gmt":"2025-09-08T14:11:42","slug":"major-construction-project","status":"publish","type":"post","link":"https:\/\/stadtwolmirstedt.de\/en\/major-construction-project\/","title":{"rendered":"Major construction project"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">Renovation of Fabrikstra\u00dfe, Heinrich-Heine-Stra\u00dfe and a section of Lindhorster Weg begins<\/h2>\n\n<p>From Monday, September 8, 2025, a major construction project will begin in Wolmirstedt that will last for many months. It affects Fabrikstra\u00dfe, Heinrich-Heine-Stra\u00dfe and a section of Lindhorster Weg, which will be completely renovated. The first construction phase is currently closed: Fabrikstra\u00dfe from the turning hammer to Schwimmbadstra\u00dfe. A detour has been signposted and leads provisionally via a western garage complex. The work in this first construction phase is expected to take around eight months.    <\/p>\n\n<p>This will be followed by four further construction phases:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>Intersection Heinrich-Heine-Stra\u00dfe\/Schwimmbadstra\u00dfe\/Fabrikstra\u00dfe<\/li>\n\n\n\n<li>Heinrich-Heine-Stra\u00dfe from Schwimmbadstra\u00dfe up to and including Friedrich-Ebert-Stra\u00dfe<\/li>\n\n\n\n<li>Heinrich-Heine-Stra\u00dfe from Friedrich-Ebert-Stra\u00dfe to Samsweger Stra\u00dfe<\/li>\n\n\n\n<li>Heinrich-Heine-Stra\u00dfe\/Samsweger Stra\u00dfe intersection with Lindhorster Weg section<\/li>\n<\/ul>\n\n<p>The entire construction project is scheduled to last until spring 2027. The city of Wolmirstedt is responsible for the road and sidewalk construction as well as the lighting. Other contractors are the WWAZ, which is constructing the wastewater pipes, rainwater pipes and drinking water pipes, and the municipal utilities, which are laying the electrical cables and district heating pipes. One third of the municipal part of the construction project is being funded by the federal government and one third by the state, while the city is contributing one third of the costs itself.   <\/p>\n\n<p>The construction work in each individual construction section will take place under full closure. The town of Wolmirstedt will inform residents and road users in good time before the start of each section. Detour will be signposted.  <\/p>\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/stadtwolmirstedt.de\/wp-content\/uploads\/2025\/09\/Bauanfang-Fabrikstrasse-1024x768.jpg\" alt=\"Start of construction Fabrikstra&#xDF;e\" class=\"wp-image-26864\" srcset=\"https:\/\/stadtwolmirstedt.de\/wp-content\/uploads\/2025\/09\/Bauanfang-Fabrikstrasse-1024x768.jpg 1024w, https:\/\/stadtwolmirstedt.de\/wp-content\/uploads\/2025\/09\/Bauanfang-Fabrikstrasse-300x225.jpg 300w, https:\/\/stadtwolmirstedt.de\/wp-content\/uploads\/2025\/09\/Bauanfang-Fabrikstrasse-768x576.jpg 768w, https:\/\/stadtwolmirstedt.de\/wp-content\/uploads\/2025\/09\/Bauanfang-Fabrikstrasse-1536x1152.jpg 1536w, https:\/\/stadtwolmirstedt.de\/wp-content\/uploads\/2025\/09\/Bauanfang-Fabrikstrasse.jpg 2000w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Renovation of Fabrikstra\u00dfe, Heinrich-Heine-Stra\u00dfe and a section of Lindhorster Weg begins<\/p>\n","protected":false},"author":1,"featured_media":26863,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"neve_meta_sidebar":"","neve_meta_container":"","neve_meta_enable_content_width":"","neve_meta_content_width":0,"neve_meta_title_alignment":"","neve_meta_author_avatar":"","neve_post_elements_order":"","neve_meta_disable_header":"","neve_meta_disable_footer":"","neve_meta_disable_title":"","neve_meta_reading_time":"","footnotes":""},"categories":[138,156,158],"tags":[],"class_list":["post-26869","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-current","category-traffic-information","category-traffic-informations"],"_links":{"self":[{"href":"https:\/\/stadtwolmirstedt.de\/en\/wp-json\/wp\/v2\/posts\/26869","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stadtwolmirstedt.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stadtwolmirstedt.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stadtwolmirstedt.de\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/stadtwolmirstedt.de\/en\/wp-json\/wp\/v2\/comments?post=26869"}],"version-history":[{"count":1,"href":"https:\/\/stadtwolmirstedt.de\/en\/wp-json\/wp\/v2\/posts\/26869\/revisions"}],"predecessor-version":[{"id":26870,"href":"https:\/\/stadtwolmirstedt.de\/en\/wp-json\/wp\/v2\/posts\/26869\/revisions\/26870"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stadtwolmirstedt.de\/en\/wp-json\/wp\/v2\/media\/26863"}],"wp:attachment":[{"href":"https:\/\/stadtwolmirstedt.de\/en\/wp-json\/wp\/v2\/media?parent=26869"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stadtwolmirstedt.de\/en\/wp-json\/wp\/v2\/categories?post=26869"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stadtwolmirstedt.de\/en\/wp-json\/wp\/v2\/tags?post=26869"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}