{"id":27292,"date":"2025-10-06T17:02:13","date_gmt":"2025-10-06T17:02:13","guid":{"rendered":"https:\/\/stadtwolmirstedt.de\/half-sided-closure-of-rosa-luxemburg-strasse\/"},"modified":"2025-10-07T09:38:02","modified_gmt":"2025-10-07T09:38:02","slug":"half-sided-closure-of-rosa-luxemburg-strasse","status":"publish","type":"post","link":"https:\/\/stadtwolmirstedt.de\/en\/half-sided-closure-of-rosa-luxemburg-strasse\/","title":{"rendered":"Half-sided closure of Rosa-Luxemburg-Stra\u00dfe"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\"><strong>Rosa-Luxemburg-Stra\u00dfe <\/strong> <strong>becomes a one-way street<\/strong><strong>due to work on the <\/strong>station forecourt<\/h2>\n\n<p>Rosa-Luxemburg-Stra\u00dfe in Wolmirstedt will be a one-way street from Tuesday, October 7 to Tuesday, October 21. This is due to a one-way closure that is necessary as part of the current construction work on the station forecourt. <\/p>\n\n<p>Rosa-Luxemburg-Stra\u00dfe will be open to traffic from Farsleber Stra\u00dfe in the direction of the train station for the two weeks in question. Driving in the opposite direction is prohibited during this time. The one-way street regulation applies to the entire Rosa-Luxemburg-Stra\u00dfe from Farsleber Stra\u00dfe to the junction with Bahnhofstra\u00dfe.  <\/p>\n\n<p>The new arrangement will be signposted. Buses that currently stop in Rosa-Luxemburg-Stra\u00dfe due to the construction work on the station forecourt and bus station will continue to stop there. <\/p>\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/stadtwolmirstedt.de\/wp-content\/uploads\/2025\/10\/BaustelleWMS-1024x576.jpg\" alt=\"Rosa-Luxemburg-Stra&#xDF;e becomes a one-way street due to work on the station forecourt\" class=\"wp-image-27289\" srcset=\"https:\/\/stadtwolmirstedt.de\/wp-content\/uploads\/2025\/10\/BaustelleWMS-1024x576.jpg 1024w, https:\/\/stadtwolmirstedt.de\/wp-content\/uploads\/2025\/10\/BaustelleWMS-300x169.jpg 300w, https:\/\/stadtwolmirstedt.de\/wp-content\/uploads\/2025\/10\/BaustelleWMS-768x432.jpg 768w, https:\/\/stadtwolmirstedt.de\/wp-content\/uploads\/2025\/10\/BaustelleWMS.jpg 1366w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<p><a href=\"https:\/\/www.openstreetmap.org\/#\" target=\"_blank\" rel=\"noopener\"><\/a><a href=\"https:\/\/www.openstreetmap.org\/#\" target=\"_blank\" rel=\"noopener\"><\/a><a href=\"https:\/\/www.openstreetmap.org\/#\" target=\"_blank\" rel=\"noopener\"><\/a><a href=\"https:\/\/www.openstreetmap.org\/#\" target=\"_blank\" rel=\"noopener\"><\/a><a href=\"https:\/\/www.openstreetmap.org\/#\" target=\"_blank\" rel=\"noopener\"><\/a>\u00a9 <a href=\"https:\/\/www.openstreetmap.org\/copyright\" target=\"_blank\" rel=\"noopener\">OpenStreetMap contributors<\/a><\/p>\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Rosa-Luxemburg-Stra\u00dfe becomes a one-way street due to work on the station forecourt<\/p>\n","protected":false},"author":1,"featured_media":18212,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"neve_meta_sidebar":"","neve_meta_container":"","neve_meta_enable_content_width":"","neve_meta_content_width":0,"neve_meta_title_alignment":"","neve_meta_author_avatar":"","neve_post_elements_order":"","neve_meta_disable_header":"","neve_meta_disable_footer":"","neve_meta_disable_title":"","neve_meta_reading_time":"","footnotes":""},"categories":[158,138,156],"tags":[],"class_list":["post-27292","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-traffic-informations","category-current","category-traffic-information"],"_links":{"self":[{"href":"https:\/\/stadtwolmirstedt.de\/en\/wp-json\/wp\/v2\/posts\/27292","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stadtwolmirstedt.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stadtwolmirstedt.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stadtwolmirstedt.de\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/stadtwolmirstedt.de\/en\/wp-json\/wp\/v2\/comments?post=27292"}],"version-history":[{"count":1,"href":"https:\/\/stadtwolmirstedt.de\/en\/wp-json\/wp\/v2\/posts\/27292\/revisions"}],"predecessor-version":[{"id":27293,"href":"https:\/\/stadtwolmirstedt.de\/en\/wp-json\/wp\/v2\/posts\/27292\/revisions\/27293"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stadtwolmirstedt.de\/en\/wp-json\/wp\/v2\/media\/18212"}],"wp:attachment":[{"href":"https:\/\/stadtwolmirstedt.de\/en\/wp-json\/wp\/v2\/media?parent=27292"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stadtwolmirstedt.de\/en\/wp-json\/wp\/v2\/categories?post=27292"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stadtwolmirstedt.de\/en\/wp-json\/wp\/v2\/tags?post=27292"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}