{"id":27752,"date":"2025-10-17T15:18:39","date_gmt":"2025-10-17T15:18:39","guid":{"rendered":"https:\/\/stadtwolmirstedt.de\/expansion-of-heinrich-heine-strasse-traffic-system\/"},"modified":"2025-10-17T16:36:20","modified_gmt":"2025-10-17T16:36:20","slug":"expansion-of-heinrich-heine-strasse-traffic-system","status":"publish","type":"post","link":"https:\/\/stadtwolmirstedt.de\/en\/expansion-of-heinrich-heine-strasse-traffic-system\/","title":{"rendered":"Expansion of Heinrich-Heine-Stra\u00dfe traffic system"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">including ancillary facilities and street lighting<\/h2>\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:33.33%\">\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"768\" height=\"1024\" src=\"https:\/\/stadtwolmirstedt.de\/wp-content\/uploads\/2025\/10\/Ausbau_Verkehrsanlage_Info-Schild-768x1024.jpg\" alt=\"Expansion_traffic_system_information_sign\" class=\"wp-image-27747\" srcset=\"https:\/\/stadtwolmirstedt.de\/wp-content\/uploads\/2025\/10\/Ausbau_Verkehrsanlage_Info-Schild-768x1024.jpg 768w, https:\/\/stadtwolmirstedt.de\/wp-content\/uploads\/2025\/10\/Ausbau_Verkehrsanlage_Info-Schild-225x300.jpg 225w, https:\/\/stadtwolmirstedt.de\/wp-content\/uploads\/2025\/10\/Ausbau_Verkehrsanlage_Info-Schild-1152x1536.jpg 1152w, https:\/\/stadtwolmirstedt.de\/wp-content\/uploads\/2025\/10\/Ausbau_Verkehrsanlage_Info-Schild.jpg 1200w\" sizes=\"(max-width: 768px) 100vw, 768px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:66.66%\">\n<p>October 17, 2025) the first construction phase is closed: Fabrikstra\u00dfe from the turning hammer to Schwimmbadstra\u00dfe. A detour has been signposted and leads provisionally via a western garage complex. The work in this first construction phase is expected to take around eight months.  <\/p>\n\n\n\n<p>This will be followed by four further construction phases:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Intersection Heinrich-Heine-Stra\u00dfe\/Schwimmbadstra\u00dfe\/Fabrikstra\u00dfe<\/li>\n\n\n\n<li>Heinrich-Heine-Stra\u00dfe from Schwimmbadstra\u00dfe up to and including Friedrich-Ebert-Stra\u00dfe<\/li>\n\n\n\n<li>Heinrich-Heine-Stra\u00dfe from Friedrich-Ebert-Stra\u00dfe to Samsweger Stra\u00dfe<\/li>\n\n\n\n<li>Heinrich-Heine-Stra\u00dfe\/Samsweger Stra\u00dfe intersection with Lindhorster Weg section<\/li>\n<\/ul>\n<\/div>\n<\/div>\n\n<p>The entire construction project is scheduled to last until spring 2027. The city of Wolmirstedt is responsible for the road and sidewalk construction as well as the lighting. Other clients are the WWAZ, which is constructing the wastewater pipes, rainwater pipes and drinking water pipes, and the municipal utilities, which are laying the electrical cables and district heating pipes  <strong>. One third of the municipal part of the construction project is funded by federal funds and one third by state funds<\/strong>one third of the costs are the city&#8217;s own funds.<\/p>\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>including ancillary facilities and street lighting October 17, 2025) the first construction phase is closed: Fabrikstra\u00dfe from the turning hammer to Schwimmbadstra\u00dfe. A detour has been signposted and leads provisionally via a western garage complex. The work in this first construction phase is expected to take around eight months. This will be followed by four&hellip;&nbsp;<a href=\"https:\/\/stadtwolmirstedt.de\/en\/expansion-of-heinrich-heine-strasse-traffic-system\/\" rel=\"bookmark\">Read More &raquo;<span class=\"screen-reader-text\">Expansion of Heinrich-Heine-Stra\u00dfe traffic system<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":27750,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"neve_meta_sidebar":"","neve_meta_container":"","neve_meta_enable_content_width":"","neve_meta_content_width":0,"neve_meta_title_alignment":"","neve_meta_author_avatar":"","neve_post_elements_order":"","neve_meta_disable_header":"","neve_meta_disable_footer":"","neve_meta_disable_title":"","neve_meta_reading_time":"","footnotes":""},"categories":[290],"tags":[],"class_list":["post-27752","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-funding-projects"],"_links":{"self":[{"href":"https:\/\/stadtwolmirstedt.de\/en\/wp-json\/wp\/v2\/posts\/27752","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stadtwolmirstedt.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stadtwolmirstedt.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stadtwolmirstedt.de\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/stadtwolmirstedt.de\/en\/wp-json\/wp\/v2\/comments?post=27752"}],"version-history":[{"count":2,"href":"https:\/\/stadtwolmirstedt.de\/en\/wp-json\/wp\/v2\/posts\/27752\/revisions"}],"predecessor-version":[{"id":27755,"href":"https:\/\/stadtwolmirstedt.de\/en\/wp-json\/wp\/v2\/posts\/27752\/revisions\/27755"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stadtwolmirstedt.de\/en\/wp-json\/wp\/v2\/media\/27750"}],"wp:attachment":[{"href":"https:\/\/stadtwolmirstedt.de\/en\/wp-json\/wp\/v2\/media?parent=27752"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stadtwolmirstedt.de\/en\/wp-json\/wp\/v2\/categories?post=27752"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stadtwolmirstedt.de\/en\/wp-json\/wp\/v2\/tags?post=27752"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}