
Funding from the EAFRD FP Replacement of circulation pumps
and installation of a sun sail in the outdoor pool WMS
Duration: 07/2025 – 10/2026
Total budget: EUR 151,452.82
Funding amount: EUR 121,162.25
1. partial replacement of circulation pumps in the basins
2. installation of an electrically operated awning in the 4-pole version, by placing cubes with sensors and electrical installation,
in the area of the toddler pool




